"the take it with you solution . . . "


Trailer Operation

 

 E-Mail Built Rite Trailers

The upper deck is loaded in the lowered position, then raised by hydraulics.
Next the upper deck is raised slowly for safety..
 

The upper deck is secured with safety locks.  The lower deck can then be loaded.  

Lastly the lower deck is loaded, then the left fender can be raised so that the driver door can be opened.
Operation is easy, safe, and fun.  This unit takes only a few minutes to learn to operate and you are set for many years and miles of fun.